Energy rating GtoEnergy rating B: detached, 2001–2010
165 homes of this kind are rated G. Bringing one up to a B costs about €35,900, of which the grants cover €19,000 — so you pay €8,600 – €16,000.

Check your own home
Your cert may say B2 — that's a B on the new scale.
A heat pump runs on electricity. Pick "Heat pump" if you have one.
A 1990s detached house on oil, rated CEnergy rating C
- Grants you’d get
- €12,500
- It costs about
- €16,500
- You pay
- €4,000 – €4,500
- Saves you each year
- about €820
- Pays for itself in
- about 7 years
The commonest home on file — 47,829 like it. Change an answer above for yours.
Modelled, not observed payments. Middle case €4,519; a quarter of these homes are over €8,930. Repaid in 7–13.4 years. Confidence 0.9.
Show what’s included
This is the job list that suits most homes like yours (4 in 10). The money above is the middle of every route we priced, so it will not add up to this list exactly.
Is the house warm enough to hold the heat? — SEAI's test before they'll fund a heat pump. The insulation steps are usually what gets you through.
Heat Loss Indicator ≤ 2.3 W/K·m² after fabric works. 29% of homes like yours already pass. Assessment about €276, grant €350 through a One-Stop-Shop.
Costs about €280 · grant €350 · the grant covers it

Heat pump — replaces the boiler, runs on electricity, pulls heat from the outside air. An outdoor unit the size of a large suitcase, bigger radiators in some rooms, three to five days. Runs cooler for longer — the house feels even, not blasted.
Air-to-water, SPF 3.5 heating / 2.5 hot water. Cost €16,832 · grant €6,500 + €4,000 (replacing oil/gas/coal) + €2,000 pipework + €700 controls = up to €13,200 · you pay from €3,632. 9.8c per kWh of heat vs gas 14.4c / oil 18.0c.
Costs about €16,500 · grant €6,500 · you pay €10,000
The paperwork — assessment first, grant approval, then the work, then a new energy cert, then the grant is paid. A One-Stop-Shop does all of it and takes the grant off the bill.
Order is mandatory — work started before approval is not eligible. Energy cert €276, assessment grant €350 through a One-Stop-Shop. Typically 3–6 months end to end (estimate).
Costs about €280 · grant €350 · the grant covers it
The numbers
As-is 514.84 → target 108.65 kWh/m²/yr primary energy. Wall U 0.55 → 0.37, roof 2.16 → 0.24, window 2.7 → 2.2 W/m²K. Heat pump share 0% → 15%. Middle case €16,035; a quarter of these homes are over €18,903. Repaid in 2.3–7.4 years. n=165, confidence 0.6.
Target: B = ≤150 kWh/m²/yr on the scale in force since 24 May 2026. Records folded into G: G on the pre-24-May-2026 scale. The G band's edges did not move, so every one of these homes would still be shown a G on a certificate issued today. Stricter B2-equivalent target (≤125 kWh/m²/yr): you pay €16,982, repaid in 2.6 years.
What the work is

Attic insulation — a thicker blanket in the roof space. Half a day, nobody moves out, you lose some storage height.
Roof U-value → 0.16 W/m²K (≈300 mm). Cost €2,000 · grant €1,500 · you pay €500.
Costs about €2,500 · grant €2,000 · you pay €520

Heat pump — replaces the boiler, runs on electricity, pulls heat from the outside air. An outdoor unit the size of a large suitcase, bigger radiators in some rooms, three to five days. Runs cooler for longer — the house feels even, not blasted.
Air-to-water, SPF 3.5 heating / 2.5 hot water. Cost €16,832 · grant €6,500 + €4,000 (replacing oil/gas/coal) + €2,000 pipework + €700 controls = up to €13,200 · you pay from €3,632. 9.8c per kWh of heat vs gas 14.4c / oil 18.0c.
Costs about €16,500 · grant €6,500 · you pay €10,000
It saves about €4,560 a year and pays for itself in about 2 years.