SEAI’s grants are the same everywhere. The homes are not. Here is what 7,612 published BERs say about homes in Meath, who SEAI registers to do the work here, and where to start.

Homes in Meath, from their BERs

Attic short of the grant standard
81%
Heat loss 2.3 or lower
54%
Commonest heating
gas, 46%
Commonest walls
filled cavity, 51%

A heat loss indicator of 2.3 or lower is what lets a home built before 2007 skip the technical assessment for a heat pump grant. Check yours

Published BERs for homes in Meath by type and age
HomeBERsWalls, most oftenAttic shortHeat loss ≤ 2.3
Detached house, before 1940541solid stone or brick 76%93%2%
Detached house, 1940–1969373filled cavity 36%87%6%
Detached house, 1970–1989733filled cavity 59%76%8%
Detached house, 1990–2004910filled cavity 71%89%33%
Detached house, 2005–2010398filled cavity 66%89%90%
Semi-detached house, 1970–1989445hollow block 53%84%13%
Semi-detached house, 1990–20041,300filled cavity 51%90%55%
Semi-detached house, 2005–2010687timber frame 44%84%97%
Mid-terrace house, 1990–2004299filled cavity 47%92%97%
Mid-terrace house, 2005–2010280filled cavity 47%83%100%
Apartment, 1990–2004752filled cavity 58%67%77%
Apartment, 2005–2010894filled cavity 58%53%88%

Existing homes assessed since 2019, in groups of at least 150 BERs. SEAI BER Research Tool, file of 8 September 2026. A pattern across homes, not a fact about any one.

Who SEAI registers to work in Meath

1471 companies on SEAI’s registers serve Meath; 26 are One Stop Shops. Registration is a fact about paperwork; SEAI does not endorse their work, and neither do we.

  • Attic insulation484
  • Cavity wall insulation89
  • Internal wall insulation460
  • External wall insulation169
  • Windows and doors380
  • Heat pumps377
  • Solar panels328
  • Heating controls378
  • Solar hot water151

The companies in Meath, with their websites

SEAI grant figures as read on 26 September 2026. They are the same in every county. Every grant, and what it pays · What order should a retrofit go in?