FixMyBER

Grant · External wall insulation · SEAI rules read 7 Sep 2026

External wall insulation grant: €6,000, 26% of a typical semi-detached job

SEAI pays €6,000 toward external wall insulation on a semi-detached house (SEAI, read 7 September 2026). SEAI's median price for that job in the first half of 2026 was €23,219, so the grant covers 26%. By type of home it runs from €3,000 for an apartment to €8,000 for a detached house. The grant has to be approved before any work starts.

News New since 27 July 2026: wrapping the outside up to 150 mm needs no planning permission, under three conditions

Budget 2027 and SEAI grants

A terrace of single-storey homes under scaffolding and pink debris netting, the roof stripped back.

A terrace wrapped in scaffolding for external wall insulation. Every outside wall is done at once.

Garrick Close, Kingston upon Hull: bungalow renovations, September 2023 · Hullian111 · CC BY-SA 4.0

See your grants for wall insulation, and what you’d pay

About 10 seconds. See your numbers first, then get quotes if you want them.

€6,000

SEAI's grant for a semi-detached house

SEAI grant page · read 7 Sep 2026

SEAI rule

€23,219

SEAI's median price for a semi-detached job

SEAI median costs · H1 2026

Published figure

26%

How much of that the grant covers

€6,000 ÷ €23,219

Published figure

€3,000–€8,000

From an apartment to a detached house

SEAI grant page · read 7 Sep 2026

SEAI rule

253

Companies on SEAI's register for external wall insulation

SEAI contractor register · 25 Sep 2026

Published figure

Updated · grants checked · prices SEAI H1 2026 · How we know · Corrections

Where this sits · the heat chain

Most heat leaves through the walls, roof, floor and windows. Fix these first and the heating has less to replace.

  1. Fabricwalls, roof, floor, windows
  2. Airdraughts and ventilation
  3. Heatheat pump or boiler, radiators, controls
  4. Usebills, comfort, the BER
  1. The idea behind itFollow the heat
  2. You are hereExternal wall insulation grant
  3. Next questionDo you need planning permission for external wall insulation?

Is there a grant for external wall insulation? Yes: €3,000 to €8,000, by type of home

SEAI's grant against SEAI's median price for the job, the first half of 2026. SEAI rule

Figure 1SEAI rule

The external wall insulation grant covers 26% of a typical semi-D job

Against SEAI’s median costs, grants cover up to 87% of a heat pump and 82% of cavity wall insulation, but 23% of heating controls and 19% of solar panels.

How much of a typical semi-D job each SEAI grant coversGrant as a share of SEAI's median cost for a semi-D: Heat pump €14,500 of €16,741, 87%; Cavity wall insulation €1,300 of €1,585, 82%; Attic insulation €1,500 of €2,101, 71%; Windows €3,000 of €7,110, 42%; Internal wall insulation €3,500 of €9,843, 36%; External wall insulation €6,000 of €23,219, 26%; Heating controls €700 of €3,000, 23%; Solar panels €1,800 of €9,500, 19%. The heat pump figure includes the €2,000 boiler scrappage grant, paid only when a fossil boiler or storage heating is removed; without it the grant covers 75%.SEMI-D OR END-TERRACEGRANT AS A SHARE OF SEAI'S MEDIAN COSTGRANT OF MEDIAN COST050%100%Heat pump87%€14,500 of €16,741€10,500 unit + €2,000 heating system + €2,000 boiler scrappageScrappage only if a fossil boiler or storage heaters go: 75% without it.Cavity wall insulation82%€1,300 of €1,585Attic insulation71%€1,500 of €2,101Windows42%€3,000 of €7,110Internal wall insulation36%€3,500 of €9,843External wall insulation26%€6,000 of €23,219Heating controls23%€700 of €3,000Solar panels19%€1,800 of €9,500Solar hot water: €1,200 grant; SEAI publishes no median cost.
How much of a typical semi-D job each SEAI grant coversGrant as a share of SEAI's median cost for a semi-D: Heat pump €14,500 of €16,741, 87%; Cavity wall insulation €1,300 of €1,585, 82%; Attic insulation €1,500 of €2,101, 71%; Windows €3,000 of €7,110, 42%; Internal wall insulation €3,500 of €9,843, 36%; External wall insulation €6,000 of €23,219, 26%; Heating controls €700 of €3,000, 23%; Solar panels €1,800 of €9,500, 19%. The heat pump figure includes the €2,000 boiler scrappage grant, paid only when a fossil boiler or storage heating is removed; without it the grant covers 75%.SEMI-D · GRANT AS SHARE OF MEDIAN COSTHeat pump87%€14,500 of €16,741incl. €2,000 scrappage (hatched), only ifa fossil boiler goes: 75% without itCavity wall insulation82%€1,300 of €1,585Attic insulation71%€1,500 of €2,101Windows42%€3,000 of €7,110Internal wall insulation36%€3,500 of €9,843External wall insulation26%€6,000 of €23,219Heating controls23%€700 of €3,000Solar panels19%€1,800 of €9,500Solar hot water: €1,200 grant, no SEAI median

Each bar is the job's median cost for a semi-D (SEAI, January to June 2026); the filled part is the grant on the individual route. Heat pump: €10,500 for the unit, €2,000 for the heating system and, since 29 Sep 2026, a €2,000 boiler scrappage grant: €14,500 of €16,741, or 75% without the scrappage grant, which needs an oil, gas, solid-fuel or storage-heating system removed.

Sources: SEAI grant pages, transcribed in pipeline/inputs/grants_2026.csv, 3 Oct 2026 · SEAI, Median costs of individual energy upgrades, Jan-Jun 2026 (H1 2026), 2026

The numbers
The numbers behind figure 1
JobGrantSEAI median costShare
Heat pump€14,500€16,74187%
Cavity wall insulation€1,300€1,58582%
Attic insulation€1,500€2,10171%
Windows€3,000€7,11042%
Internal wall insulation€3,500€9,84336%
External wall insulation€6,000€23,21926%
Heating controls€700€3,00023%
Solar panels€1,800€9,50019%

What the grant covers, by type of home

The external wall insulation grant against SEAI's H1 2026 median price, by type of home
House typeSEAI's median priceMost the grant paysCoversLeft to pay
Mid-terrace€14,000€3,50025%€10,500
Semi-detached€23,219€6,00026%€17,219
Detached€26,500€8,00030%€18,500
Apartment€11,300€3,00027%€8,300

SEAI grants, read 7 Sep 2026 · SEAI median costs H1 2026

Gutters, downpipes, window boards and door thresholds all move out to suit the new depth. The house changes appearance, so check with the council if you are in a conservation area. It keeps every room at its full size, unlike insulating inside.

Four things SEAI asks for, in its own words

Our plain version first, then SEAI's sentence as we read it. SEAI decides each application, not us. SEAI rule

01

The home was built and lived in before 2011. SEAI rule

“before 2011 for the Insulation, windows and doors, or heating control grants,”

SEAI, Individual grants: Homeowner Application Guide, read 10 Oct 2026

02

Every outside wall ends up insulated. SEAI rule

“To receive the grant, all external walls of your home must be fully insulated.”

SEAI, Wall insulation grant, read 10 Oct 2026

03

Some houses need planning permission first. SEAI rule

“In some cases, the installation of External Wall Insulation on your house may require planning permission.”

SEAI, Individual grants: Homeowner Application Guide, read 10 Oct 2026

04

The grant is approved before any work starts. SEAI rule

“You must have grant approval in place before you start work.”

SEAI, Individual grants: Homeowner Application Guide, read 10 Oct 2026

Approval takes minutes. Payment takes 4–6 weeks

Every SEAI grant runs the same six steps, and nothing starts before the offer. SEAI rule

Figure 2SEAI rule

Approval takes minutes and payment 4–6 weeks; the wait in between isn't published

SEAI publishes minutes from online application to offer, 30 days to accept, 8 months to finish and claim, and 4–6 weeks to pay. It publishes nothing for the assess, works or claim steps.

The six gates of an SEAI individual grant, with the waits SEAI publishesassess, apply, approve, works, claim, paid. Published waits: Apply: minutes (online; by post ~5 working days); Approve: 30 days (to accept the offer); Paid: 4–6 weeks (after complete paperwork); 8 months from offer to claim. One Stop Shop route: 12 months.. Not published: assess, works, claim. Nothing starts before the offer. Work or materials paid for before it lose the grant. Marked step: Apply.THE INDIVIDUAL GRANT ROUTE · SEAI PAGES READ 8 SEP 202601AssessHeat pumps only: atechnicalassessmentYOU + ASSESSOR?not publishedbooking anassessorTHIS PAGE02ApplyOnline, with thecontractor'sdetails and yourmeter numberYOUminutesonline; by post~5 working days03ApproveSEAI's grantoffer. Nothingstarts before itSEAI30 daysto acceptthe offer04WorksThe contractordoes the jobCONTRACTOR?not publishedthe contractor'sdiary05ClaimNew BER,declaration ofworks, request forpaymentYOU + ASSESSOR?not publishednew BER, thenany inspection06PaidSEAI pays thegrant into youraccountSEAI4–6 weeksafter completepaperwork8 monthsfrom offer to claim. One Stop Shop route: 12 months.Check first:nothing starts before the offer. Work or materials paid for before it lose the grant.
The six gates of an SEAI individual grant, with the waits SEAI publishesassess, apply, approve, works, claim, paid. Published waits: Apply: minutes (online; by post ~5 working days); Approve: 30 days (to accept the offer); Paid: 4–6 weeks (after complete paperwork); 8 months from offer to claim. One Stop Shop route: 12 months.. Not published: assess, works, claim. Nothing starts before the offer. Work or materials paid for before it lose the grant. Marked step: Apply.INDIVIDUAL GRANT ROUTE · READ 8 SEP 202601AssessHeat pumps only: atechnical assessmentYOU + ASSESSOR?not publishedbooking anassessor02 · THIS PAGEApplyOnline, with thecontractor's details andyour meter numberYOUminutesonline; by post~5 working days03ApproveSEAI's grant offer. Nothingstarts before itSEAI30 daysto accept; then 8months to claim(One Stop Shop: 12)04WorksThe contractor does the jobCONTRACTOR?not publishedthe contractor'sdiary05ClaimNew BER, declaration ofworks, request for paymentYOU + ASSESSOR?not publishednew BER, thenany inspection06PaidSEAI pays the grant intoyour accountSEAI4–6 weeksafter completepaperworkCheck firstNothing starts before the offer. Work ormaterials paid for before it lose the grant.

The six steps of the do-it-yourself grant route, in order. Under each step is the timing SEAI publishes, or a dashed box where it publishes none; we read every SEAI page, the terms and the homeowner guides on 8 Sep 2026. The 8-month window runs from the offer to the claim (One Stop Shop route: 12 months). Nothing starts before the offer. Work or materials paid for before it lose the grant. The marked step is the one this page is about: apply.

Sources: SEAI individual grant pages, as summarised in content/application-status.md, 8 Sep 2026 · SEAI How to apply and homeowner application guide, summarised in content/how-to-apply.md, 8 Sep 2026

The numbers
The numbers behind figure 2
StepWhoPublished timing
Assessyou + assessornot published
Applyyouminutes (online; by post ~5 working days)
ApproveSEAI30 days (to accept the offer)
Workscontractornot published
Claimyou + assessornot published
PaidSEAI4–6 weeks (after complete paperwork)

Up from €4,500 in 2019 to €6,000 now

SEAI's grant for a semi-detached house at every change since May 2019, read from archived copies of SEAI's pages. SEAI rule

Figure 3SEAI rule

The external wall grant for a semi-D has gone from €4,500 to €6,000 since 2019

€4,500 from May 2019, then €6,000 from Feb 2022.

SEAI grant for a semi-detached house, individual route, May 2019 to Oct 2026: external wall €4,500 to €6,000Grant for a semi-detached or end-terrace house on SEAI's individual route, by date: Heat pump: €3,500 from May 2019, €6,500 from Feb 2022, €12,500 from Feb 2026, €14,500 from Sep 2026; External wall: €4,500 from May 2019, €6,000 from Feb 2022; Internal wall: €2,200 from May 2019, €3,500 from Feb 2022; Windows: €3,000 from Mar 2026; Solar panels: €3,800 from May 2019, €3,000 from Feb 2020, €2,400 from Feb 2022, €2,100 from Jan 2024, €1,800 from Jan 2025; Attic: €400 from May 2019, €1,300 from Feb 2022, €1,500 from Feb 2026; Cavity wall: €400 from May 2019, €1,200 from Feb 2022, €1,300 from Feb 2026. Heat pump: the full bundle (unit, central heating and the bonus or scrappage grant) from Feb 2026; the unit grant alone before. Solar panels: the maximum, including the battery grant while there was one (to Feb 2022).€ GRANT, SEMI-D OR END-TERRACE, INDIVIDUAL ROUTE, MAY 2019–OCT 20260€5k€10k€15k2020202120222023202420252026€4,500 in 2019€6,000 from Feb 2022Heat pump€14,500External wall€6,000Internal wall€3,500Windows€3,000Solar panels€1,800Attic€1,500Cavity wall€1,300Heat pump from Feb 2026: unit + central heating + bonus (scrappage from 29 Sep 2026). Before: unit only.Solar panels: maximum grant, with the battery grant while it lasted (to Feb 2022).
SEAI grant for a semi-detached house, individual route, May 2019 to Oct 2026: external wall €4,500 to €6,000Grant for a semi-detached or end-terrace house on SEAI's individual route, by date: Heat pump: €3,500 from May 2019, €6,500 from Feb 2022, €12,500 from Feb 2026, €14,500 from Sep 2026; External wall: €4,500 from May 2019, €6,000 from Feb 2022; Internal wall: €2,200 from May 2019, €3,500 from Feb 2022; Windows: €3,000 from Mar 2026; Solar panels: €3,800 from May 2019, €3,000 from Feb 2020, €2,400 from Feb 2022, €2,100 from Jan 2024, €1,800 from Jan 2025; Attic: €400 from May 2019, €1,300 from Feb 2022, €1,500 from Feb 2026; Cavity wall: €400 from May 2019, €1,200 from Feb 2022, €1,300 from Feb 2026. Heat pump: the full bundle (unit, central heating and the bonus or scrappage grant) from Feb 2026; the unit grant alone before. Solar panels: the maximum, including the battery grant while there was one (to Feb 2022).€ GRANT, SEMI-D, INDIVIDUAL ROUTE0€5k€10k€15k2020202220242026€4,500€6,000Heat pump€14.5kExternal wall€6,000Internal wall€3,500Windows€3,000Solar€1,800Attic€1,500Cavity wall€1,300Heat pump from Feb 2026: unit + heatingsystem + bonus or scrappage. Solar: max,incl. battery grant to Feb 2022.

Each line is the grant SEAI listed for a semi-detached or end-terrace house on its individual route (you manage the job), read from Internet Archive copies of seai.ie’s grant pages at every capture where the page changed. Heat pump: €3,500 from May 2019, €6,500 from Feb 2022, €12,500 from Feb 2026, €14,500 from Sep 2026. External wall: €4,500 from May 2019, €6,000 from Feb 2022. Internal wall: €2,200 from May 2019, €3,500 from Feb 2022. Windows: €3,000 from Mar 2026. Solar panels: €3,800 from May 2019, €3,000 from Feb 2020, €2,400 from Feb 2022, €2,100 from Jan 2024, €1,800 from Jan 2025. Attic: €400 from May 2019, €1,300 from Feb 2022, €1,500 from Feb 2026. Cavity wall: €400 from May 2019, €1,200 from Feb 2022, €1,300 from Feb 2026. The February 2022 rise was announced on 9 February; SEAI’s pages show it by the end of March, and the exact start date is not confirmed.

Sources: Internet Archive captures of seai.ie grant pages, 11 May 2019 to 2 Oct 2026 (research/data-pulls/2026-10-05/history/grant_history.csv, 148 rows, each tied to a saved capture), 5 Oct 2026 · SEAI news, 'Government launches the National Retrofitting Scheme', 9 Feb 2022 · SEAI heat pump page, read by fixmyber, 2 Oct 2026

The numbers
The numbers behind figure 3
Job (semi-D)Jun 2019Apr 2022Mar 2026Oct 2026
Heat pump€3,500€6,500€12,500€14,500
External wall€4,500€6,000€6,000€6,000
Internal wall€2,200€3,500€3,500€3,500
Windows——€3,000€3,000
Solar panels€3,800€2,400€1,800€1,800
Attic€400€1,300€1,500€1,500
Cavity wall€400€1,200€1,300€1,300

Questions people ask

How much does it cost in Ireland?
The middle price for the work in 2025 was €23,219 for a semi-detached house. With the €6,000 grant you pay about €17,219.
Do I need planning permission?
Usually not for an ordinary house, but a protected structure or a conservation area does need permission first.
How long does it take?
Two to four weeks with scaffolding up. You stay living in the house the whole time.

How we know

Sources

SEAI, Individual grants: Homeowner Application Guide, 10 Oct 2026 · SEAI, Median costs of individual energy upgrades, H1 2026

Found a mistake? Every fix is dated on Corrections. Method in full: How we know.

See your grants and what you’d pay

Four questions about your home, then your numbers. Get quotes from registered contractors if you want them.

Check my home

Updated · grants checked · prices SEAI H1 2026 · How we know · Corrections