External wall insulation grant: €3,000 – €8,000

The biggest grant of any single job, and the biggest bill — a detached house gets €8,000 towards it.

What external wall insulation is and how the wrap goes on

A terrace of single-storey homes under scaffolding and pink debris netting, the roof stripped back.
Garrick Close, Kingston upon Hull: bungalow renovations, September 2023 · Hullian111 · CC BY-SA 4.0 · Photo credits

What would it cost on your home?

What kind of home?
When was it built?
What's the energy rating?

Your cert may say B2 — that's a B on the new scale.

How is it heated?

A heat pump runs on electricity. Pick "Heat pump" if you have one.

A 1970s–80s detached house on oil, rated DEnergy rating D

Grants you’d get
€19,000
It costs about
€36,400
You pay
€9,000 – €16,300
Saves you each year
about €1,790
Pays for itself in
about 9 years

The commonest home on file — 23,707 like it. Change an answer above for yours.

Modelled, not observed payments. Middle case €16,329; a quarter of these homes are over €23,200. Repaid in 9.113.6 years. Confidence 0.9. One job in this list has no SEAI median price, so its cost is an estimate.

Or see who is registered in your county
Show what’s included

This is the job list that suits most homes like yours (2 in 10). The money above is the middle of every route we priced, so it will not add up to this list exactly.

  • Attic insulationa thicker blanket in the roof space. Half a day, nobody moves out, you lose some storage height.

    Roof U-value → 0.16 W/m²K (≈300 mm). Cost €2,000 · grant €1,500 · you pay €500.

    Costs about €2,500 · grant €2,000 · you pay €520

  • Wall insulationthe walls get a warm coat: pumped into the cavity (a morning), fitted inside (rooms shrink about 10 cm, redecorate, one to two weeks) or wrapped outside (scaffolding, new render, two to four weeks). We pick what your walls allow.

    Cavity → 0.55, €1,550 · grant €1,300 · pay €250. Internal → 0.27, €10,420 · €3,500 · €6,920. External → 0.21, €23,247 · €6,000 · €17,247. Pre-1970 solid walls can't take cavity fill.

    Costs about €9,000 · grant €4,500 · you pay €4,500

  • New windows and doorsdouble or triple glazed, fitted a room at a time over two to three days. You need not do every window, but the grant is paid once.

    Whole-window U → 1.4 W/m²K. Estimate: €490/m² of window (no SEAI median), about €9,085 on a semi-detached house. Grant €3,000 + €800/door (max 2).

    Estimated at €13,700 · grant €4,000 · you pay €9,700

  • Is the house warm enough to hold the heat?SEAI's test before they'll fund a heat pump. The insulation steps are usually what gets you through.

    Heat Loss Indicator ≤ 2.3 W/K·m² after fabric works. 1% of homes like yours already pass. Assessment about €276, grant €350 through a One-Stop-Shop.

    Costs about €280 · grant €350 · the grant covers it

  • Heat pumpreplaces the boiler, runs on electricity, pulls heat from the outside air. An outdoor unit the size of a large suitcase, bigger radiators in some rooms, three to five days. Runs cooler for longer — the house feels even, not blasted.

    Air-to-water, SPF 3.5 heating / 2.5 hot water. Cost €16,832 · grant €6,500 + €4,000 (replacing oil/gas/coal) + €2,000 pipework + €700 controls = up to €13,200 · you pay from €3,632. 9.8c per kWh of heat vs gas 14.4c / oil 18.0c.

    Costs about €16,500 · grant €6,500 · you pay €10,000

  • The paperworkassessment first, grant approval, then the work, then a new energy cert, then the grant is paid. A One-Stop-Shop does all of it and takes the grant off the bill.

    Order is mandatory — work started before approval is not eligible. Energy cert €276, assessment grant €350 through a One-Stop-Shop. Typically 3–6 months end to end (estimate).

    Costs about €280 · grant €350 · the grant covers it

Do you qualify?

  • Your home was built and lived in before 2011.
  • There is room around the house for scaffolding.
  • Your home is not a protected structure — those need permission first.

Roughly 1 in 10 1970s–80s detached homes already pass the first check.

Worked out from the energy ratings of 23,707 homes like these in SEAI’s records. “You pay’ is what is left after the grants, for the middle half of them.

Grant, amount payable and yearly saving for the most common homes
HomeGrantYou paySaves a yearPays back in
A 1970s–80s detached house on oil, rated DEnergy rating D€19,000€9,000 – €16,300€1,7909 years
A pre-1970 detached house on oil, rated F/GEnergy rating F/G€23,000€13,300 – €18,100€4,1505 years
A 1990s detached house on oil, rated DEnergy rating D€19,000€8,500 – €12,300€1,28010 years
A pre-1970 terrace house on gas, rated DEnergy rating D€15,900€6,800 – €7,400€1,1109 years

detached|1970-1989|D|oil: net p50 €16,329, p75 €23,200, repaid 9.1–13.6 yrs, confidence 0.9 · detached|pre1970|FG|oil: net p50 €18,106, p75 €25,076, repaid 4.5–6.4 yrs, confidence 0.9 · detached|1990-2005|D|oil: net p50 €12,294, p75 €17,906, repaid 10.1–14 yrs, confidence 0.9 · terrace|pre1970|D|gas: net p50 €7,403, p75 €11,932, repaid 8.6–11.5 yrs, confidence 0.9.

More home types
A 1990s detached house on oil, rated C€12,500€4,000 – €4,500€8207 years
A 1990s semi-detached on gas, rated C€12,500€4,300€54011 years
A 1990s semi-detached on oil, rated C€12,500€4,300€47011 years
A 1970s–80s detached house on oil, rated C€10,300€5,000 – €8,900€76015 years
€36,400The work− €19,000Grants€16,300You pay
A 1970s–80s detached house on oil, rated D — middle of 23,707 homes.
now10 yr20 yrwithout a grant: 20 yearspays for itself in about 9 years
Quicker quarter 5.8 yr · middle 9.1 yr · slower quarter 13.6 yr · saving €1,790/yr.

Why oil homes pay back fastest

The dearer your heat is now, the more you save by changing it. A unit of heat from a heat pump costs about a third of what the same heat costs on electric heating, and well under what it costs on oil or bottled gas.

Heat pump9.8cGas14.4cOil18.0cLPG25.2cElectric34.4c
Useful cent per kWh delivered into the room, SEAI Domestic Fuel Cost Comparison.
What’s entailed
  • External wall insulationthe house gets a warm coat on the outside, then a new render. Scaffolding goes up, two to four weeks, and you keep living in it.

    Wall U-value → 0.21 W/m²K. Cost €23,247 · grant €6,000 · you pay €17,247.

    Costs about €23,200 · grant €6,000 · you pay €17,200

  • Attic insulationa thicker blanket in the roof space. Half a day, nobody moves out, you lose some storage height.

    Roof U-value → 0.16 W/m²K (≈300 mm). Cost €2,000 · grant €1,500 · you pay €500.

    Costs about €2,000 · grant €1,500 · you pay €500

  • New windows and doorsdouble or triple glazed, fitted a room at a time over two to three days. You need not do every window, but the grant is paid once.

    Whole-window U → 1.4 W/m²K. Estimate: €490/m² of window (no SEAI median), about €9,085 on a semi-detached house. Grant €3,000 + €800/door (max 2).

    Estimated at €9,100 · grant €3,000 · you pay €6,100

  • Heat pumpreplaces the boiler, runs on electricity, pulls heat from the outside air. An outdoor unit the size of a large suitcase, bigger radiators in some rooms, three to five days. Runs cooler for longer — the house feels even, not blasted.

    Air-to-water, SPF 3.5 heating / 2.5 hot water. Cost €16,832 · grant €6,500 + €4,000 (replacing oil/gas/coal) + €2,000 pipework + €700 controls = up to €13,200 · you pay from €3,632. 9.8c per kWh of heat vs gas 14.4c / oil 18.0c.

    Costs about €16,800 · grant €6,500 · you pay €10,300

The grant in detail, by house type
Apartment€3,000
Terrace€3,500
Semi-detached or end of terrace€6,000
Detached€8,000
  • Gutters, downpipes, window boards and door thresholds all move out to suit the new depth.
  • The house changes appearance, so check with the council if you are in a conservation area.
  • It keeps every room at its full size, unlike insulating inside.

Amounts verified 2026-09-08.

How we worked this out

We group every home in SEAI’s energy rating records by kind, age, rating and heating, then work out the cheapest set of jobs that would bring each one up to a B. Prices for those jobs are the middle price SEAI recorded for that work last year; grants come from SEAI’s published amounts; fuel prices come from SEAI’s comparison table.

So these are worked-out figures for homes like yours, not a record of what anyone was charged. Your own quote will land somewhere in the range, and the wider the range, the less certain we are.

2025 medians (n=47,067 upgrades; OSS n=1,406). 2026-07-01. BER file 2026-09-08, 1,077,114 rows. DEAP standard occupancy.

The full method

Common questions
How much does it cost in Ireland?
The middle price for the work in 2025 was €23,247 for a semi-detached house. With the €6,000 grant you pay about €17,247.
Do I need planning permission?
Usually not for an ordinary house, but a protected structure or a conservation area does need permission first.
How long does it take?
Two to four weeks with scaffolding up. You stay living in the house the whole time.