Skip to content
FixMyBER

How to get a mid-terrace house built 1940–1969 to an A or B

Insulated walls and a heat pump are what most set the A- and B-rated mid-terrace houses built 1940–1969 apart in published BERs. How high a home can go depends on the house.

Get quotes for your home

SEAI-registered contractors, side by side. Free, no email needed.

A two-storey town terrace on a corner in Cork, painted fronts, a bilingual parking sign at the kerb.
Terrace houses in High Street, from Summerhill South, Cork · David Hawgood · CC BY-SA 2.0 · Photo credits

The numbers

A or B now
6%
Under the heat pump line
14%
Grants in the plan
€22,850
You pay
€34,680

The one job that most often gets these homes under the heat pump line is insulating the walls: on its own it does it for 30% of the ones above it. To reach B2, a heat pump on its own gets 21% of those short of it there.

A or B, and the heat pump line: certificates for a sale or letting, January 2019 to September 2026 (7,454 for mid-terrace houses built 1940–1969; 4,572 with a heat loss figure, which certificates carry from July 2022). One job: the 3,952 of them above the heat pump line and the 7,094 short of B2. Grants and costs: the worked plan, self-managed, from SEAI's published grants and median costs. SEAI BER Research Tool, file of 26 September 2026 (CC BY 4.0 (SEAI)). A pattern across similar homes, not a fact about yours.

The detail

What A- and B-rated homes like this have

Share of A or B and of C to E certificates for mid-terrace houses built 1940–1969 with each upgrade
A or BC to E
Solar panels23%5%
Insulated walls68%16%
A heat pump30%0%
An insulated floor35%14%
New high-performance windows43%4%
An attic insulated to the grant standard39%10%
Mechanical ventilation5%1%

30% of the A- and B-rated ones have a heat pump, and 68% heat with an oil, gas or LPG boiler. Their median heat loss indicator is 1.87, against 3.04 for the C-to-E ones.

Solar PV · Walls U ≤ 0.37 · Heat pump · Floor U ≤ 0.45 · Windows U ≤ 1.6 · Roof U ≤ 0.16 · Mechanical ventilation. A or B = A1 to B3; C to E = C1 to E2, on the old scale.

Every certificate for mid-terrace houses built 1940–1969, 2019-2026: 3,804 rated A or B, 11,408 rated C to E. What those homes have, not proof of what got them there. SEAI BER Research Tool, file of 26 September 2026 (CC BY 4.0 (SEAI)). A pattern across similar homes, not a fact about yours.

The heat pump line: one job at a time

86% of these homes are above the line. The share of those that each job, done on its own, brings under it:

Single jobs that bring mid-terrace houses built 1940–1969 under the heat pump line
One job on its ownBrought under the line
Insulating the walls30%
Topping up the attic7%
Replacing the windows5%
Blocking unused chimneys and flues2%
Draught-proofing1%
Any one of them36%

The 3,952 certificates for a sale or letting for mid-terrace houses built 1940–1969 above the line. SEAI BER Research Tool, file of 26 September 2026 (CC BY 4.0 (SEAI)). A pattern across similar homes, not a fact about yours.

Each job is applied on its own to each certificate with a simplified heat balance, not DEAP. The model’s HLI matches SEAI’s published HLI to a median ratio of 0.997 (IQR 0.985–1.01). Method: research/ber, thresholds.

The B2 line: one job at a time

98% of these homes are short of B2. The share of those that each job, done on its own, gets there:

Single jobs that bring mid-terrace houses built 1940–1969 to B2
One job on its ownReach B2
A heat pump21%
Solar panels15%
Insulating the walls0%
Topping up the attic0%
Replacing the windows0%
Any one of them24%

The 7,094 certificates for a sale or letting for mid-terrace houses built 1940–1969 short of B2. SEAI BER Research Tool, file of 26 September 2026 (CC BY 4.0 (SEAI)). A pattern across similar homes, not a fact about yours.

The worked plan, in order

The engine’s plan for the house published BERs most often describe for this age, in the order SEAI’s rules need. A plan, not a BER assessment.

  • 1Energy assessment (BER and advisory report)no grant · €275
  • 2Attic insulation€1,400 grant · €2,200
  • 2External wall insulation (the wrap)€3,500 grant · €14,000
  • 2Windows€1,800 grant · €4,650
  • 2External doors€1,600 grant · €4,230
  • 2Airtightnessno grant · €1,600
  • 2Mechanical ventilationno grant · €4,000
  • 3Heat pump technical assessment€200 grant · €500
  • 3Heat pump (air to water)€6,500 grant · €16,000
  • 3Radiators and pipework for the heat pump€2,000 grant
  • 3Renewable heat bonus€4,000 grant
  • 4Solar panels (PV)€1,800 grant · €9,250

Self-managed: about €22,850 in grants against works of about €57,530, leaving about €34,680 to pay.

Attic insulation: Attic insulation grant, read 13 Jul 2026 · External wall insulation (the wrap): Wall insulation grant, read 8 Jun 2026 · Windows: Windows and doors grant, read 13 Jul 2026 · External doors: Windows and doors grant, read 13 Jul 2026 · Costs are SEAI’s medians, not quotes. Whether a grant is paid is SEAI’s decision on your application.

The full worked plan, step by step

The two lines that matter